HARBORHOIST LIFT INSTALLATION

lpl installation 1

STEP ONE

The HarborHoist is easily transported to your location.

lpl installation 2

STEP TWO

The lift can be launched at a ramp, or lifted in with a vertical lift.

lpl installation 3

STEP THREE

The HarborHoist is place in the water, at this time the tanks are spread apart to proper beam width. The bunks are also set to the boats specifications.

lpl installation 4

STEP FOUR

Placing of the bumper system (Slide Assembly).

lpl installation 5

STEP FIVE

The lift is secured to the dock, and boat placed. A typical install is between 1-2 hours for a complete docking system.